White Glove Group has over 25 years of combined project management experience in asbestos abatement. We take pride in completing projects ahead of schedule and over expectation. Our methods and attention to detail separate us from our competition.
Our four solutions to a successful demolition and
or asbestos abatement project:
Wisconsin regulations require facility owners or operators to inspect for asbestos before demolition or renovation, and our certified inspectors provide cost-effective solutions for projects of all sizes.
Any asbestos-containing demolition must follow Wisconsin NR 447 and federal NESHAP regulations, and our team ensures compliance and timely paperwork processing.

To comply with NR 447, asbestos abatement requires wetting ACM to prevent emissions, using sealed containers for disposal, and securing DNR approval for exceptions, with all waste sent to licensed disposal sites.
All waste containing at least 1% asbestos must follow NR 502 and NR 506 storage, transport, and disposal regulations, and our certified team ensures full compliance for projects of any size.

Our inspection process is specifically designed to identify building materials that might contain asbestos. Bulk samples are collected from suspect materials and analyzed to determine if they contained asbestos. All ACMs are assessed for damage and the potential for exposure.
For building demolition it is required that a certified Asbestos Inspector perform a thorough and comprehensive site inspection and survey of all the construction materials, including the building site foundations, underground utilities, and potentially inaccessible and hidden materials; and to document the inspection findings and results in a formal Asbestos Survey Report.
For building renovation, the inspection and Asbestos Survey Report is limited to the affected construction materials that may be disturbed by the renovation.
The purpose of the Asbestos Survey Report is to document and certify which building construction materials DO NOT contain asbestos. At the same time the survey report is used to identify and quantify the ACM required to be removed prior to a facility demolition or renovation activity that may disturb the ACM, so that neither of these activities release asbestos fibers to the ambient air.
The Asbestos Survey Report must identify all the suspect building materials containing asbestos that were confirmed NOT to contain asbestos, and also include a separate results table summarizing and listing all the suspect materials that tested positive for asbestos.
The results table that lists the materials that tested positive for asbestos must include the following assessments of the materials containing asbestos:
Better Processes, Better Results
We deliver value through Healthy High Performance Cleaning, making your facility healthier and safer.
Proactive Management
Our proactive management team focuses on quality, custom solutions, and ensuring program success.
Commitment to Green Cleaning
Our Green Clean program uses eco-friendly products to enhance sustainability and facility efficiency.